search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommercial HVAC

Committing The Design Team To Making A Profit

In the planning stages, some designers miss out on the money-making steps.

By Howard McKew, P.E., C.P.E.
Tomorrow's Environment
October 6, 2017

What is the missing piece after the design contract has been awarded and the basis of design is kicking off the design phase of the project? From my design experience, the first step in the action plan is to understand the owner’s building program, which should address project timeline and construction cost. Also, you must ask if  O&M will have a role in this project and the soft cost (e.g., furnishing, consulting fees).

Armed with this knowledge, the owner’s project requirement (OPR) can be drafted next. Integral with this should be the HVAC design engineer completing an HVAC System Analysis and Selection (refer to 2016 ASHRAE Handbook — HVAC Systems and Equipment and 2015 Handbook— HVAC Applications). This analysis and proposed selection(s) should be completed, although I’m sure this process gets passed over and the design engineer simply jumps to the solution, and quite often the solution doesn’t result in a sit-down with the owner, owner representation/project manager, and/or the O&M manager. Omitting this step in the OPR results in the design team moving on to the basis of design (BofD) and begins the conceptual phase of the design.


This should tell the team how much the design would cost. If it’s over the direct labor cost of the actual fee, then the team has to go back and rethink the number of drawings to be produced. The team is building a Cadillac with a Toyota budget.


So what got overlooked in this process? I believe right after the OPR had been substantially established, the HVAC design engineer should have gathered her design team, sat down with them for a roundtable discussion on agreements to date, and then opened up a conversation regarding the team’s mission to meet client and project satisfaction. Next, the discussion should transition to an open forum on the consulting fee and how this HVAC team was going to make a profit, noting this goal is as important as completing a successful design and construction effort. True, the architect heading up the job will be less sensitive, if not insensitive, to the consultant’s goal to make a profit. As a mentor of mine once said, “There is no carrot at the end of the stick” when thinking the extra effort will be appreciated by others. The cold hard reality is that he was correct. If the design team is not profitable, what is their value to the company?

So I use my automobile analogy to explain how to do a great job for owner and project and make a profit, too. If you have $20,000 to buy a new car, you don’t go to a Cadillac dealership. They don’t sell new cars that fit your budget. You head to a dealership that sells new cars in the $20,000 range and buy a car within your budget that includes all the features you would have wanted on the Cadillac but couldn’t afford. That said, the lead engineer for the HVAC design team outlines how much money is in the fee for direct labor to complete the design and construction administration.

Often, the design will begin with no discussion of how many contract drawings to be produced. Instead, the design team simply starts drawing. A rule of thumb I’ve had for years is that every drawing represents 100 hours of design and drawing labor. Sure, a standard detail sheet doesn’t take 100 hours, and a central chiller plant design will most likely take more than 100 hours. If you average all the drawings out, it should come to a budgeted value around 100 hours per. Taking these hours and multiplying the cost using an average hourly rate (e.g., design engineer), this should tell you how much direct labor cost it will be to complete the documents.

Add in labor for meetings, writing the specification, and a select few other categories using more specific hourly rates, and this should tell the team how much the design would cost. If it’s over the direct labor cost of the actual fee, then the team has to go back and rethink the number of drawings to be produced. The team is building a Cadillac with a Toyota budget.

The open forum I’ve just discussed won’t take more than an hour from start to finish, and yet it may be the most valuable hour spent on the job. It also should bring “buy-in” by the entire team. Left in the dark, what do they care if they produce 30 drawings or 45 drawings? Each employee will do what he or she is told unless you change how work is performed.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Howard McKew is author of Integrated Project Delivery for Building Infrastructure Opportunities for HVAC consultants and mechanical contractors and can be reached at hmckew@bss-consultant.com or at www.buildingsmartsoftware.com. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Make a Profit: A Must for Contractors

    See More
  • Make ‘Profit' The Operative Word In 2005

    See More
  • Filtration test teaches Homewood schools how to pocket a profit

    See More

Related Products

See More Products
  • new cover.jpg

    Profit is An Attitude: The Strategies You Need to Optimize Profits

  • air came to a stop.jpg

    The Air Came to a Stop

  • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

See More Products

Related Directories

  • A to Z Sales & Marketing

    We strive to revolutionize indoor living through innovative solutions that improve air quality, enhance comfort, and promote sustainable living for people around the world.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing