search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsVentilation and IAQHVAC RetrofitsCase in Point

Case In Point

Music Venue Hits The Right Note For ERV Maintenance

House of Blues

When the House of Blues in Boston was in need of an energy recovery wheel retrofit, the entertainment venue found a solution that took limited downtime with no disruption to street traffic.

July 13, 2017

With help from celebrity investors like Dan Aykroyd and Aerosmith, House of Blues has been an iconic franchise in live music since 1992. The popular Boston location that opened in 2009 next to Fenway Park is a prime spot for concerts and private events. A packed schedule that leaves little downtime for repair of the club’s HVAC equipment means that reliability and ease of maintenance are extremely important factors when making purchasing decisions.

In 2016, energy recovery wheels in two rooftop air handlers became blocked after six years of exposure to airborne particulates. Although efforts were made to unclog the damaged wheels, cleaning in place was not an option due to concerns that water and cleaning fluids could damage the ductwork and ceilings below.

Without working energy recovery wheels, the heating and cooling systems were forced to work overtime at increased cost to provide a comfortable indoor environment for the 2,000-plus concertgoers. The building’s service contractor, Cullen Mechanical, determined that the wheels were beyond repair and needed to be replaced.

Cullen’s engineers knew from past experience that simply replacing the wheels without solving the cleaning problem would invite the same undesirable maintenance situation. At House of Blues, airborne particles from the large crowds, special effects vapors, and confetti would continue to clog the new wheels if the energy transfer matrix could not be periodically maintained.

When selecting replacement wheels, Cullen prioritized both ease of installation and the ability to clean or replace the energy recovery matrix once the units were in operation. As they’ve done in the past, Cullen chose Airxchange Aftermarket replacement energy recovery wheels as the best solution moving forward.

Airxchange says it offers a wheel design that allows a single person to remove pie-shaped energy transfer segments with basic hand tools to be cleaned outside of the cabinet. The refresh-capability of Airxchange wheels means that they can be cleaned as often as the application dictates.

In contrast, the only cleaning or repair solution for the original wheels at House of Blues was to replace the entire wheel structure every five to six years, at great time and expense to the building owner.

After an onsite visit, an engineer from Airxchange presented Cullen Mechanical with a six- to eight-hour wheel replacement plan that minimized HVAC system downtime, ensuring that the two units would be operational for the start of that evening’s show.

Because of constraints of the air handler design, which blocked the removal or installation of fully assembled wheels, Cullen selected a replacement wheel kit from Airxchange that could be assembled within the cabinet of the AHUs.

Another reason for choosing the Airxchange replacement kit was that all of the components could be carried through the theater and up the stairs to the roof, avoiding the cost and complexity of having a police detail shut down the sidewalk on Boston’s busy Lansdowne Street in order to operate a crane.

The replacement wheels were fully assembled and tested at the factory before being partially dismantled to fit into the unique access points of the air handler. Once the old wheels were removed, the two Airxchange wheels were assembled inside of the cabinet in less than four hours.

Recognizing that entertainment venues often require more frequent cleanings than traditional HVAC comfort applications, Cullen took additional steps to reduce their client’s energy costs and potential HVAC system downtime. In addition to installing a fully-serviceable wheel, they also ordered a complete set of replacement segments for each unit. With a spare segment set on hand, operators can save time and maintenance costs by completely restoring the performance of any wheel in about 15 minutes. Once removed, dirty segments can be restored and prepared for the next cleaning cycle by soaking overnight in a cleaning solution.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Contracting
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Residential Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Case In Point

    Music Venue Hits The Right Note For ERV Maintanance

    See More
  • Case In Point

    Symphony hall cooling tower hits the right notes

    See More
  • Springtime Is the Right Time for Commercial HVAC Maintenance

    See More

Related Products

See More Products
  • Green Tips for Building Maintenance Engineers

  • Tech_CommRef_Guide_Small.jpg

    Technician’s Guide & Workbook for Quality Maintenance on Commercial Refrigeration Equipment

  • HVAC and Refrigeration Preventive Maintenance.jpeg

    HVAC and Refrigeration Preventive Maintenance

See More Products

Events

View AllSubmit An Event
  • September 9, 2025

    How Maintenance Plays into the HVAC Decarbonization Trend

    On Demand This webinar will explore maintenance strategies for advanced HVAC systems, including VAVs and demand-controlled ventilation.
View AllSubmit An Event

Related Directories

  • Association for Facilities Engineering-AFE

    AFE provides education, certification, technical information and other relevant resources for plant and facilities operations, engineering and maintenance professionals worldwide.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing