search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering News

Honeywell to modernize 21 FAA buildings

IndustryNews
April 7, 2017

Honeywell has announced a facility infrastructure modernization project at 21 Federal Aviation Administration (FAA)-operated facilities across the United States. Officials said the project will create 95 related jobs over the course of the program and is expected to help the FAA reduce the energy use in those facilities by nearly 10%.

The project will be funded through a combination of an Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Grant from the Department of Energy and a 23-year, $10.8 million energy savings performance contract (ESPC). The ESPC will enable the FAA to fund the upgrades using annual energy and operational savings guaranteed by Honeywell, eliminating the need for upfront capital investment.

Honeywell will lead work for the multi-phased, facility infrastructure upgrades to air traffic control towers (ATCT), terminal radar approach controls (TRACON), and air route traffic control centers (ARTCC) at 21 locations across the FAA’s Central Service and Eastern Service areas. The project will enable the FAA to address deferred maintenance to critical building systems, reduce overall energy costs, and implement renewable energy sources.

“Aging infrastructure can be crippling to an organization’s annual budget and hinder its ability to meet organizational goals,” said John Rajchert, president of Honeywell Building Solutions. “Our work with the FAA is a prime example of how energy savings performance contracts are a valuable tool to help customers address critical building needs without further hindering capital budgets. That’s a winning solution.”

The project will focus on upgrading infrastructure and industrial processes at FAA Air Traffic Control facilities to make the buildings more energy and operationally efficient. The work includes:  

• Installing solar panel arrays to help power FAA facilities

• Installing energy-efficient LED lighting

• Upgrading building automation systems for improved HVAC control

According to Honeywell, the project is slated to be completed by the summer of 2018 and is expected to help reduce the FAA’s energy use by more than 6 million kilowatt hours per year.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Commercial Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Honeywell to Modernize 21 FAA Buildings

    See More
  • IndustryNews

    LonMark teams with DOE to modernize the smart grid

    See More
  • Grid

    White House requests proposals to modernize the nation’s electric grid

    See More

Events

View AllSubmit An Event
  • December 9, 2025

    Beyond Smart Buildings: Why BMS Needs to Move Past Division 23 — For Every Building

    On Demand Let’s reframe Division 25 not as a lofty ideal, but as a practical and alternate approach to specifying facility systems such as a building management systems (BMS).
View AllSubmit An Event
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing