search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsCommissioningCommercial HVAC

Design Reviews

Knowing a building owner’s expectations will go a long way in choosing the correct review path.

By Rebecca T. Ellis, P.E.
Design Reviews
September 5, 2016

Full-scale commissioning always starts in the design phase and includes at least one design review cycle. However, the concept of “design review” is overly broad, and it is important for the design review expectations of the commissioning professional to be objectively defined during the scope and fee development portion of a commissioning project.

There are various types of design reviews available in the design and construction industry. The most common, in alphabetical order, are as follows.

Commissioning. Focused on compliance with the Owner’s Project Requirements (OPR), controls and dynamic operation, systems integration, accessibility and maintainability, and energy efficiency.

Constructability. Focused on the feasibility, practicality, and efficiency of building the structure and installing the systems shown on the designers’ drawings within the project’s schedule and budget.

Coordination. Focused on confirming that coordination between trades has been worked out on the design drawings. For example, is there space above the ceilings, in the shafts, and in the mechanical/electrical rooms for all equipment, piping, conduit, and ducts to be installed without interfering with each other? Also, are the drawings consistent with respect to sizes and types of piping, ductwork, and conduit that end on one drawing and continue on another drawing?

Peer. Focused on the design engineers’ assumptions, calculations, and equipment selection. A peer review will also evaluate the sizing of ductwork, piping, and conduit.

Although these four focused review types have some inherent overlaps, for the most part they are unique and need to be understood as such. Asking a consultant to perform a peer review will not result in a constructability review; asking for a coordination review will not be the same as requesting a commissioning review, etc.

The required skill set and background of the reviewers are different for each of the design review types. In addition, the level of effort required to perform each review is different and essentially mutually exclusive of each other. The following table summarizes the expertise and background an owner would want when contracting for the different design review services. In addition, I have offered a very broad order of magnitude-type estimate of what the owner might expect to pay for each of the types of reviews as a percentage of a project’s total construction cost.

When soliciting and procuring commissioning services, owners need to determine the type of design review they want from their commissioning provider and manage expectations accordingly. These expectations should be articulated in the request for proposal and/or contract documents.

Knowing what the owner expects is important when selecting a commissioning team that can provide the desired skill sets. For example, if it is simply a commissioning design review, i.e., the default minimum level of review one should expect as part of a commissioning process, then the design reviewers should be commissioning engineers and/or facilities operations professionals with hands-on systems operations experience.

If the owner wants both a commissioning review and a peer review, then the review team needs to also have someone with substantial design engineering experience. That “someone” could be the same individuals with commissioning and/or facilities operations experience, i.e., they may have been design engineers at one time. However, their credentials should clearly differentiate between which past projects they designed and which past projects/buildings they commissioned and/or operated. 

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Residential Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    Third-Party Design Reviews: Cornerstones of the Commissioning Process

    See More
  • Commissioning

    Design Review In Design Phase vs. Construction Phase

    See More
  • Commissioning

    Prioritizing the Design Portion of Design-Build

    See More

Related Products

See More Products
  • Manual_SPS_new.jpg

    Manual SPS HVAC Design for Swimming Pools and Spas [ANSI/ACCA 10 Manual SPS - 2010 (RA 2017)]

  • DUCT DESIGN.gif

    HVAC Systems Duct Design

  • 9781439842126.jpg

    Heat Exchanger Design Handbook, Second Edition

See More Products

Events

View AllSubmit An Event
  • June 24, 2025

    Regional Considerations in Data Center MEP Design: From Desert to Coast

    On Demand Join ES NEWS' Editor Austin Keating and the panel for an expert examination of regional data center design strategies. They will be joined by data center commissioning experts and manufacturer representatives.
  • October 8, 2025

    Heat Rejection Solutions: Leverage Data to Optimize Design

    On Demand This webinar will present real performance data for evaporative cooling towers, closed circuit coolers, hybrids, dry, and adiabatic coolers, clarifying tradeoffs and utility impacts.
View AllSubmit An Event

Related Directories

  • Design Polymerics

    Design Polymerics manufactures low VOC, LEED qualified, duct sealants, duct liner adhesives and insulation mastics. We now offer silicones and MS polymer sealants.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing