search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering TechnologyHVAC Engineering SectorsVentilation and IAQHeating & BoilersEducational Facilities HVAC

Building Program To Basis Of Design For A New College Dormitory Building Project

By Howard McKew, P.E., C.P.E.
college615
June 8, 2015

At some point, most college or university building committees are given the responsibility to establish a building upgrade program to enhance their campus and appeal to potential future students. When ready, a Building Program (BP) will be the cornerstone for investing in an HVAC design and eventual construction of HVAC systems to meet the Building Program requirements.

For the HVAC engineer, he will take the Program information and craft a Basis of Design (BofD) using the suggested BofD template on page 2 of this B2B. For this month’s test, we will document the BP for a new college dormitory building in Fredericksburg, VA.  On page 2 of this B2B, the reader shall complete the BofD by checking the correct boxes from the multiple choice selections based on the BP information provided and from pertinent reference documents such as local weather data design criteria for this city. The answers to the BofD can be found at www.esmagazine.com.

The new building is a 21,000-sq-ft, three-story structure along with a basement for storage, mechanical room, and electrical room. The building will require a special security system that will be integrated with the HVAC system for smoke control, as well as with security TV cameras at strategic locations. Existing utilities from the campus distribution systems will provide chilled water, hot water heating, domestic hot water, electrical power, telecommunication, city water, fire protection, and security systems to this new building.

Electrical, plumbing, fire protection, and security consultants will work in sync with the HVAC design team to provide a complete mechanical-electrical installation and shall be per state and local codes.

The HVAC electrical will remain 120/1/60 for motors less than .50 hp and 480/3/60 for motors .50 hp and larger. The campus central hot water system shall provide 2,400 MBH heating capacity to the individual ceiling mounted fan coil units, unit heaters, and central AHU preheat coil. The HVAC central air system shall be one direct outside air system with energy recovery from the various exhaust systems to provide ventilation to each dorm room, corridor, and sitting area. This central AHU will also have MERV 8 pre-filters and MERV 14 final filters and a chilled water-cooling coil. Supply fan motor shall be VFD to provide constant supply air as its filters become dirty (increase in filter pressure drop). Outdoor air will be direct-connected to the back of each fan coil unit, and each unit will have its own space temperature control. There is no requirement for standby capacity and no system/equipment spare capacity for BP growth.

The HVAC design of this building renovation shall be based on ASHRAE 2015 Application Handbook chapter 7 Educational Facilities for basis of design requirements. The new building will be LEED Platinum certified, and the design engineer will draw upon the ASHRAE Advanced Energy Design Guide for more specific energy conservation design opportunities. 

When beginning to shape the BofD, the engineer should take into account the ASHRAE recommended HVAC system analysis and selection process found in chapter 1 of its 2012 Systems and Equipment Handbook and continue on with the BofD data collection by reviewing chapter 3 Central Cooling and Heating to determine the optimum HVAC systems for this BP.

The HVAC system will be designed for 24-hr operation, 365 days a year. The building’s hot water heating system shall be an outdoor temperature compensated system (160?F HWS & 120?F HWR at 17?F outdoors and shall be off when temperature reach 60?F). Chilled water system shall be 42?F CHWS & 56?F CHWR when outdoor temperature is greater than 60F. Occupied space shall be maintained at 70?F with no humidity control in the heating season and 76?F with a maximum 60% rh during the air conditioning season. Equipment room and back-of-the-room support areas will be maintained 24 hrs/day at 68?F with no humidity control in the heating season and 78?F with a maximum 65% rh during the air conditioning season.

There will be LEED Platinum certification requirements with other specialized energy/environmental program criteria based on ASHRAE recommended school guidelines. The reader is directed to the “Facility Files” for the Owner’s Building Program Annual Operating Budget and Operating Program.

 As the design phase for this BP goes forward, the BofD should be routinely referenced and updated based on changes in the BP, as well as changes and/or enhancements to the HVAC design. 

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Howard McKew is author of Integrated Project Delivery for Building Infrastructure Opportunities for HVAC consultants and mechanical contractors and can be reached at hmckew@bss-consultant.com or at www.buildingsmartsoftware.com. 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • designconstructionimage422

    Building Program To Basis Of Design For A New K-Middle School Building Project

    See More
  • back2basics

    Building Program To Basis Of Design For A New Commercial Office Building Shell & Core Building Project

    See More
  • Back2Basics June 2014

    Building Program To Basis Of Design For A Renovated College Student Union New Building Project

    See More

Related Products

See More Products
  • Manual LLH Cover_Final.jpg

    Manual LLH - 2019 (HVAC System Design for Low Load Homes)

  • Manual_SPS_new.jpg

    Manual SPS HVAC Design for Swimming Pools and Spas [ANSI/ACCA 10 Manual SPS - 2010 (RA 2017)]

  • Green Tips for Building Maintenance Engineers

See More Products

Events

View AllSubmit An Event
  • January 22, 2026

    Smarter Hydronic Design for Data Centers

    On Demand Instead of relying on large centralized pumps and restrictive balancing/control valves, distributed pumping uses packaged pumping systems and smart circulators located closer to the point of demand.
View AllSubmit An Event

Related Directories

  • Building Performance Assn.

    The Building Performance Association is a membership-driven 501(c)6 industry association dedicated to advancing the home and building performance industry by delivering improved energy efficiency, health, safety, and environmental performance of buildings through our members and network.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing