search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Design/Construction ProcessCommissioning

COMMISSIONING

An Appropriate Level Of Effort

A tricky RFP question gets trickier when the “correct” answer might depend on the particular owner.

By Rebecca T. Ellis, P.E.
Commissioning
July 1, 2014

The following is a question posed in a recent Request for Proposal (RFP) for commissioning services.

Describe how you intend to determine appropriate level of commissioning effort for the various systems and equipment.

This is different than a question about sampling rates for various systems. It appears to be about how closely the commissioning professional intends to inspect each system that is sampled. This seems to imply that the owner would accept different levels of effort for different systems, but it offers no sense of the owner’s priorities. I understand that this is an opportunity for the proposers to make their best guess at what might be the correct answer in the owner’s mind, and the answer would potentially be reflective of the pre-proposal time spent getting to know the owner and the owner’s expectations.

However, I could not bring myself to put in writing that I would do anything other than fully observe and test the functional performance of each commissioned system. Where would one draw the line?

  • Could you suggest that some systems really don’t need to meet all of the specified requirements?
  • Could a proposer actually say something like, “Temperature control in System X is not critical and will not be tested, but we will test the life safety features.”
  • Could you propose to only commission operational features that affect energy consumption, or that affect indoor air quality, or that affect infection control, etc.?

If a system has been deemed important enough for the owner to put it on the list of systems to be commissioned, how can the prospective commissioning professional suggest it may be more or less important than others? The level of effort per system — let’s call it “hours per system” — will necessarily vary with the complexity of the systems, not because of the criticality of the systems.

I believe the level of effort through the design review, submittal review, construction observation, and functional performance phases of the commissioning process should be as required to clarify, observe, and functionally test all specified features of each system. Where we have seen the level of effort vary widely from project-to-project is in the post-testing follow-up.

By the time a project reaches the “issues closeout” phase, the commissioning professional has become very familiar with the owner’s level of interest and involvement in the commissioning process and its outcome. The owner’s priorities have also become clear to the commissioning professional. Some owners are fully engaged and actually consider the commissioning process their best bet for receiving building systems that function properly. At the other end of the spectrum are owners who have not taken the time to understand the commissioning process and see it only as another box to be checked off for regulatory or credentialing purposes.

The question of “level of effort” may apply only to the owner’s response to any out-of-compliance issues. If the owner puts a high priority on resolving a particular problem, the commissioning professional should track, nudge, and retest until the issue is resolved. If the owner believes the system is acceptable “as is,” even though it does not exactly meet the contract requirements, the issue will be closed.

We expect that most owners’ priorities will be dependent on each issue’s criticality to (1) safety, (2) indoor air quality, (3) energy efficiency, (4) life expectancy of equipment, and (5) general contractual compliance. The commissioning professional should be a resource for the owner in determining the ramifications of each commissioning issue on these factors. 

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    News
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Oil-free compressors

    Why Oil-Free Compressor Technology Is an Appropriate Choice for Institutional Buildings

    See More
  • Rheem 9-11 Food Bank.png

    Rheem Part of Effort to Pack 8 Million Meals for 9/11 Day Meal Pack Program

    See More
  • Beaudin Ganze reaches a higher level of green

    See More

Related Products

See More Products
  • Sheet_Metal_Level-1.gif

    Sheet Metal Level 1 Trainee Guide, 3rd Edition

  • TGW_Entry Level_cover.jpg

    Technician’s Guide & Workbook for Entry Level Tech's

  • cover

    Sheet Metal Level 3 Trainee Guide, 4th Edition

See More Products

Events

View AllSubmit An Event
  • October 14, 2012

    Taking Energy Solutions to the Next Level: Selling Efficiency Effectively

    MSCA LIVE 2012's optional program, Taking Energy Solutions to the Next Level: Selling Efficiency Effectively,will highlight the true value of improving energy efficiency.
View AllSubmit An Event

Related Directories

  • DunAn Microstaq Inc.

    DMQ's closed loop control solutions optimize HVACR system performance via precise superheat control and rapid response. Electronic expansion valves; valve controllers; sensors, superheat, pressure, temperature.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing