search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommissioningCommercial HVAC

Commissioning

Designer Copy/Paste

Don’t let this all too common practice create confusing specifications.

By Rebecca T. Ellis, P.E.
Commissioning
June 1, 2014

In December 2013, this Commissioning column addressed the challenges posed by controls contractors who “cut and paste” the design engineer’s sequences of operation into the controls submittal. In a nutshell, a seemingly perfect controls submittal can be a red flag that the controls contractor has not given much thought to the specified system performance and the hardware and programming required to achieve that performance.

I received the following response to that column from a controls contractor:

I was reading your recent article. I agree with you on most of this; however, our number one complaint as a controls contractor is the never-ending use of “copy and paste” being done by design engineers. When  it comes down to it, most engineers have no real clue of what is specified or called out in the sequence because their entire project is copy and paste of sections from their last ten projects. This is the MOST frustrating part of our work. As I look at the projects we are currently working on, I can clearly see this; most specs have not changed in years.

This reader has a valid point that design engineers have also been known to — sometimes — not give much thought to how the systems they are designing will actually operate. This is just as challenging, if not more so, for commissioning professionals. We often see design specifications with sequences of operation that do not exactly reflect the equipment and systems scheduled and laid out on the drawings. We believe this problem starts with one of the following two scenarios:

  1. The design engineering firm has a “master” sequences-of-operation specification that is applied to every project.
  2. The design engineer does, indeed, copy/paste from their last “similar” project.

Neither of these scenarios is a problem unless the design engineer neglects to carefully and thoroughly edit the “master” or “cut/paste” sequences to match the specific requirements of the current project. This happens often enough that we spend a fair percentage of our commissioning design review time reviewing and documenting the disconnects between the sequences of operation and the systems/equipment needing to be controlled.

I knew from living in the design engineering world for many years that “controls” are considered a specialty expertise and are intimidating to many design engineers. I’m not sure why that is, but it appears to be a continuing phenomenon.

Many large engineering firms have a controls “guru,” and I believe this is the person who writes and maintains a firm’s master controls specification. However, it appears that the controls guru is not necessarily involved in every project helping the other engineers understand how to apply and customize the master sequences to their projects. I believe these firms either need to allot more of their guru time to projects or do a better job of training their non-gurus on controls and how to use the master specification.

 For firms without a knowledgeable, experienced, and passionate controls guru, the design engineers appear to do the best they can by drawing on past project sequences (prepared by themselves or others in the firm) or by being vague about sequences of operation altogether. The latter approach results in allowing the sequences of operation to be defined by the controls contractor, making controls something of a design/build effort. In this situation, I believe it would be better to bring a controls contractor into the design process to assist the engineer in defining customized sequences of operation for the bid specifications. These sequences would then be something meaningful the commissioning professional could review against the owner’s project requirements before the contract is awarded.  

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    News
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Flux

    J.C. Whitlam Mfg. Co.: Paste Flux

    See More
  • Eaton: Variable Frequency Drive

    See More
  • Commissioning

    Controls Programming Versus Design

    See More

Related Directories

  • Design Polymerics

    Design Polymerics manufactures low VOC, LEED qualified, duct sealants, duct liner adhesives and insulation mastics. We now offer silicones and MS polymer sealants.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing