search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSHVAC Engineering SectorsHVAC Design/Construction ProcessCommissioningCommercial HVAC

Commissioning

Functional Performance Test Sampling

Testing it all typically isn’t an option. How to determine what (and how many) to check?

By Rebecca T. Ellis, P.E.
Commissioning
January 2, 2014

In the standard commissioning process, there are two primary technical activities that occur on site at the end of construction and prior to systems acceptance by the owner. The first is completion of Pre-Functional Checklists (PFC), and the second is execution of the Functional Performance Tests (FPT).

In almost all cases, the PFCs are developed by the commissioning professional for completion in the field by the contractors responsible for each system. The commissioning professional collects and reviews the PFCs as a prerequisite for performing the FPTs. The expectation is that 100% of all commissioned systems are subject to the PFC process. This includes each HVAC terminal unit, lighting control zone, and plumbing mixing valve, as well as the central mechanical and electrical systems.

If money and time were no object, functional performance testing of 100% of all systems would also be conducted for the most thorough commissioning process available. However, the time and cost inherent to testing hundreds of VAV terminal units, heat pumps, fan-coil units, lighting occupancy sensors, etc., in a single project typically compels the building owner to accept a random sampling process.

I recommend 100% testing of all central/infrastructure systems and their associated controls. These include central chiller plants, central boiler plants, central air handling systems, and both main and emergency power systems. One hundred percent testing should also extend to mission critical systems, which vary from project to project depending on the building owner’s criteria.

Sampling starts to make economic sense when there are more than 10 of a similar type of non-mission critical system. These are typically industry standard HVAC system terminal units (VAV boxes, unit heaters, perimeter radiation, etc.) and terminal lighting control devices such as occupancy sensors. For projects pursuing LEED certification, my experience is that project reviewers have no problem with sampling rates as low as 20% for these types of systems. I have a personal rule of no less than two tests of each type of similar system.

Control system programming is often copy/paste for these types of systems, and as such, sampling will quickly identify systemic control issues that are likely repeated at all typical systems. The risk of sampling versus 100% testing is the possibility of missing unique hardware failures that have nothing to do with control programming, e.g., disconnected damper actuators, stuck control valves, missing or miswired sensors, and so forth. There is also the possibility that the copy/paste programming technique may result in mismapped control points at some, but not all, of the terminal units.

By choosing to sample versus testing 100% of selected systems, the building owner is making a conscious financial decision to address some of the latter failure scenarios under the normal warranty process once they are found and diagnosed by occupants and facilities management professionals. When deciding which systems to sample, owners need to assess their in-house capacity and skill set to deal with issues in a timely fashion during the warranty period.

Owners also need to evaluate the risk associated with certain systems not functioning properly at the time of project acceptance. For example, there may be some systems, such as hospital surgery suite terminal units, that must be 100% tested while other similar terminal units serving office and support spaces can be sampled. Another example would be a conference center’s meeting room lighting controls needing 100% testing while the same conference center’s back-of-house lighting controls can be sampled.

 In summary, FPT sampling is a legitimate commissioning strategy that can be successful if applied thoughtfully and customized for each project.  

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Ground Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    Functional Performance Test Sampling

    See More
  • Commissioning

    TAB is a Prerequisite for Functional HVAC System Performance

    See More
  • Commissioning

    The Right Time For Test Procedure Development (Part 1)

    See More

Related Products

See More Products
  • test manual.gif

    HVAC Air Duct Leakage Test Manual

  • HVAC Air Duct Leakage Test Manual, 2nd Edition

  • ACCA Tech Guide_EPA 608_COVER_small.jpg

    Technician's Guide & Workbook for EPA 608 Test

See More Products

Related Directories

  • Building Performance Assn.

    The Building Performance Association is a membership-driven 501(c)6 industry association dedicated to advancing the home and building performance industry by delivering improved energy efficiency, health, safety, and environmental performance of buildings through our members and network.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing