search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCommissioning

Commissioning

Teams: Lacrosse And Construction

In the game of commissioning and construction, there is no “I” in team. All the players must work together to score the efficiency goal.

By Rebecca T. Ellis, P.E.
Commissioning
September 23, 2013
I spent many hours this past summer watching my son play lacrosse and couldn’t help thinking about how the team sport of lacrosse is similar to the team sport of design and construction. I’m sure this is analogous to the other team sports that move an object up and down a rectangular field, court, or rink, but this is how I see its comparison with lacrosse.
 

THE PLAYERS

Midfielders (middies) are responsible for moving the ball up the field between the two goals. They are also responsible for recovering from setbacks and getting an unsettled game back into control. These players are similar to the skilled contractors and tradespeople who build, install, connect, and essentially make most of the noticeable progress in a construction project. 
 
Defenders are often their team’s largest and most intimidating players, responsible for preventing the other team from getting the ball to and/or into the goal. To be successful, they need to combine brute force with a keen perception of where and how things might go wrong. Then they need the finesse to steal the ball from the opponents and turn the tide for their own team. This is a critical part of what project managers do in construction projects. Project managers need to constantly be vigilant to what’s happening on a project and use their power and intelligence to prevent major failures in installation, schedule, and budget control.
 
Attack lacrosse players focus on the offense around the opponent’s goal. They are the “closers” when it comes to the final details of scoring goals. Attackmen are not the only players who shoot and score, but it is the attack’s plans and execution — involving both attack and middies — that result in goals. The game cannot be won without goals, and usually lots of them. The attack role is similar to MEP coordinators, controls contractors, TAB contractors, and commissioning professionals. 
 

THE STRATEGY

As noted above, project managers and defenders are critical to a project’s (team’s) success because they guard against major set-backs and outright failures. No lacrosse team can win a game if the other team can score goals without resistance. Similarly, no con-struction project will succeed if mistakes are always being made and needing to be corrected.
 
At the other end of the field, middies are regularly tempted to run down the field with the ball and shoot it at the goal (run and gun), bypassing the attack altogether. At first blush, this seems easier and faster and promises more glory for the middies than engaging the attack in the play. In construction, this is analogous to a construction team that believes all they need to do is install equipment; connect pipes, ducts, and electricity; and turn it on.
 
In lacrosse, the run-and-gun approach works pretty well for little boys’ teams who haven’t played long enough to pass and catch the ball consistently well with those tricky sticks and nets. However, as the years pass, those teams that don’t force themselves to pass and catch with confidence will not have a chance against the opponents’ bigger, stronger, and faster defenders. Those defenders will be able to read the middies’ minds and get between them and the goal to stop the score.
 
In mature and highly skilled lacrosse, the attack is critical to scoring goals and winning games. This is the same for anything but the simplest of construction projects as well. A project will not be successful without the full engagement of the skilled closers involved in systems integration, balancing and controls, and third-party commissioning verification.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Residential Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Ground Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Trimble Dodge

    Study: Digital Workflows Help Design and Construction Companies Manage Their Projects and Companies Better

    See More
  • Allianz Infographic

    Seven Trends Making Engineering and Construction Projects Bigger and Costlier

    See More
  • Loureiro Logo 600

    Loureiro Acquires Pelletier Builders to Expand Capabilities as Fully-Integrated Engineering and Construction Team

    See More

Related Products

See More Products
  • Building Information Modeling: Planning and Managing Construction Projects with 4D CAD and Simulations

  • 1966.gif

    HVAC Duct Construction Standards - Metal and Flexible

  • 9781482255676.jpg

    Testing and Balancing HVAC Air and Water Systems, Fifth Edition

See More Products
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing