search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCommissioning

Commissioning

Substantial Completion Confirmation

When is the project complete? Who decides? Here is one example.

By Rebecca T. Ellis, P.E.
Commissioning
June 1, 2013
This is apt to be the last of my series of columns regarding the relationship between Substantial Completion management and efficient and successful commissioning. Previous columns have addressed various reasons why projects are being declared substantially complete when the building systems are barely functional and ideas for how to improve that situation. This month’s column will look at how substantial completion is actually determined by the owner and/or owner’s representative.
 
What is the process for confirming Substantial Completion? Is the project substantially complete because the Substantial Completion date has arrived? Does the owner’s representative physically confirm completion of all criteria? Does the owner’s representative rely on feedback from other trusted non-contractor sources for confirmation (e.g., design team, commissioning professional, other outside professionals, etc.)? 
 
Does the owner’s representative accept the contractors’ assertion that Substantial Completion has been reached? What if the Substantial Completion date arrives and the owner disagrees with the contractors’ assertion? From what I have seen, that is when the owner’s resolve is at its lowest; the consequences of not agreeing to Substantial Completion are perceived to be far worse than the consequences of moving forward without contractual compliance.
 
Arlen Solochek, District Director of Facilities Planning and Development for the Maricopa (Arizona) County Community College, shared some of contract terms they establish prior to construction so that everyone knows what the rules will be when they get to the end.
 
For the purposes of this Contract, the term “beneficial occupancy” is not recognized as having any meaning or impact on defining the meaning or Date of Substantial Completion. Full or partial occupancy or use of the facility by the Owner shall not, in and of itself, constitute or be sufficient for determining a date or state of Completion. All of the following are conditions precedent for Substantial Completion:
  • Inspection, approval, occupancy and other permits issued by regulatory agencies having jurisdiction and without conditions. Conditional permits do not satisfy Substantial Completion requirements.
  • All building systems in place, complete, functional and accepted by the Architects.
  • HVAC system is tested and balanced with a preliminary balance report submitted to, and accepted by, the Architect and the Owner.
  • Odor and fume generating activities are complete. 
  • Draft submittal of O&M manuals have been submitted and accepted by the Architect and Owner, and O&M training necessary for the Owner’s personnel to maintain operation and occupancy of the facility has been completed. Contractor remains liable and responsible for any damage to systems or equipment until Owner receives this information and training.
  • Remaining punch-list items do not represent a hazard or create an adverse impact to the Owner and occupants in order for the contractor and his subcontractors to complete.
  • The Owner is able to fully occupy and utilize all portions of the Work.
These requirements are backed up by liquidated damages for missing the Substantial Completion deadline and different liquidated damages for going beyond a contractually-established time period between Substantial and Final Completion. This is an owner who takes successful and timely project completion seriously. Commissioning is inherent to Item 2 as the process for confidently accepting the building systems, thus making successful completion of commissioning testing a prerequisite for Substantial Completion. 
 
Ellis is president of Questions & Solutions Engineering Inc. (Chaska, MN). E-mail her at Rebecca.Ellis@QSEng.com

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Rebecca is president of Questions & Solutions Engineering, Inc. She can be reached at rteesmag@qseng.com

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Light Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • Commissioning

    Substantial Completion & Knowledgeable Owners

    See More
  • Commissioning

    What Is Substantial Completion?

    See More
  • Commissioning

    When “Substantial Completion” Is Insubstantial

    See More

Related Products

See More Products
  • SMACNA-logo8.gif

    Architectural Sheet Metal Inspection Guide

  • 112058072720552801834076395011509172226.jpg

    Heat Pumps, 2nd Edition

  • Bob's House.jpg

    Bob's House

See More Products

Related Directories

  • Swiss Rotors

    SR produces HVAC solutions (energy and heat recovery). They automated a substantial amount of their production, so they offer high-quality products at affordable prices.
  • HB Fuller Construction / Foster Products

    Foster® Products manufacturers and globally markets advanced solutions with substantiated proven performance - products that adhere, seal, coat, encapsulate, remove, and generally enhance the performance of insulation materials and systems.
  • Sheet Metal Connectors Inc.

    Spiral pipe and fittings with Complete Seal and E-Z Flange, rectangular duct and fittings, flat oval spiral pipe, with a complete line of HVAC accessories.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing