search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCase in Point

AHUs make suite comfort a ‘can of corn' at Jacksonville's new ballpark

April 30, 2004
While much of the new Baseball Grounds of Jacksonville ballpark’s 10,000 seats are open-air seating, the park also features 12 suites and a suite-level club, both air conditioned for those warm Jacksonville afternoon and evening games. Exhaust fans were also employed to help keep the open-air spectator area cool on the hottest days and nights.
When the Baseball Grounds of Jacksonville, FL, first opened last spring, thousands of AA baseball fans came out to celebrate the completion of the new home of the Jacksonville Suns. Described as the "future of baseball," the new 93,000-sq-ft facility replaced a nearly 50-year-old sports stadium and aligned the town for Triple-A baseball expansion possibilities in two years.

While much of the new ballpark's 10,000 seats are open-air seating, the park also features 12 suites and a suite-level club, both air conditioned for those warm Jacksonville afternoon and evening games. In addition to the cooling for the suites, 27 Loren Cook Company exhaust fans were employed to help keep the open-air spectator area cool on the hottest days and nights.

W.W. Gay Mechanical Contractors (Jacksonville, FL) was awarded the contract to ensure that fans watching the games from these special sections did so in comfort. To cool the administration area, the training and locker room, and the suite areas, W.W. Gay installed seven Carrier 39M Aero central station air handlers.

The ballpark's system was linked to Jacksonville's first central chilled water plant located in downtown, thus there's no need for a mechanical room or cooling towers and no concerns about noise or space restrictions tied to chillers. Five AHUs were placed at the lower level of the park on the service level, and one rooftop unit was installed to serve the suites. Each suite and the concession areas also received Carrier fancoil units.

Addressing Issues Faced ‘In The Field'

The contractor was particularly pleased with how well the Carrier units tackled issues that contractors often face in the field. It's unfortunately common, W.W. Gay's vice president and general superintendent Terry Shepard explained, for some HVAC equipment to get damaged in shipping or when stacked on the job site.

According to Shepard, none of these problems were encountered with the Aero, whose galvanized, prepainted steel casings have a unique structural frame designed to not only carry their own weight, but also to enable easy and safe removal of all panels for servicing. Also, as a key safety feature, there are no exposed sheet metal edges anywhere on Aero's appliance-quality finish.

W.W. Gay superintendent Rick Knight said that in addition to economics, the AHUs were selected because of their dependability and the reliability of the vendors. "When it came time to assemble the Aero sections, we simply fastened them together using the factory-installed latches and hand tool. We didn't have to worry about squaring up ‘racked' units or the alignment and installation of countless bolts," Shepard said. "Our labor time was reduced substantially over conventional bolted designs."

According to Knight, local contractors also always face the possibility of oxidation problems due to the high humidity. White rust sometimes forms on galvanized surfaces when moisture gets in during shipment, outside storage, or during installation in exposed buildings. However, the unit was specifically designed to prevent leakage; each panel and section-to-section connection rests against tight, automotive-type seals. "All of the Aero unit's panels are galvanized, pre-painted steel both inside and out," Knight said. "We had no problems with white rust."

Pregame Warmup

Like most contractor projects, the new Jacksonville ballpark required that mechanical contractor, John J. Christy, have the A/C system operational prior to building occupancy to help dry out the building. However, Knight explained, in an unfinished building environment there is plenty of moisture and contaminants - from sanding, sweeping, and VOC emissions - that can get into an HVAC system, which can lead to potential future IAQ problems.

"The Aero units were so dry and clean, we had no problem using them to help dry out the rest of the ballpark building," Knight added. Throughout the inaugural season in the new stadium, the HVAC system preformed admirably. Nearly 360,000 fans turned out to see the Los Angeles Dodgers affiliate play last season and even when the Suns shone brightly, they were likely pretty comfortable. ES

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    News
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Commercial Market
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    HVAC Residential Market
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • UTC Building Solutions Hit a Home Run in New Atlanta Braves Ballpark

    See More
  • Michigan school district beholds the power of corn

    See More
  • Home Health + Comfort: A Breath Of Fresh Air (Can Be Profitable)

    See More

Related Products

See More Products
  • comfortcoolingdvd.jpg

    COMFORT COOLING REFRIGERATION SYSTEM TROUBLESHOOTING

See More Products

Related Directories

  • Owens Corning

×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing