search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
  • NEWS
  • TECHNOLOGY
    • Heating & Boilers
    • Cooling & Chillers
    • Pumps & Flow Controls
  • SECTORS
    • Commercial
    • Health Care
    • Data Center
    • Educational Facilities
  • DESIGN | CONSTRUCTION
  • OTHER TOPICS
    • High-Performance Buildings & Automation
    • Ventilation and IAQ
    • Commissioning
    • HVAC Retrofits
  • TODAY’S BOILER
    • Today’s Boiler Archives
    • Today’s Boiler Digital Edition
  • MORE
    • Case Studies
    • Podcasts
    • Videos
    • Directory
    • Webinars
    • ES NEWS Store
    • White Papers
  • SIGN UP
  • Back to The NEWS
Engineered Systems NEWSCase in Point

Institute retrofit: An Education in Multitasking

May 25, 2000
The 21-story Illinois Institute of Technology Research Institute building (Chicago) was constructed in 1963 and, naturally, its hvac systems were designed and installed based on tenant occupancy and needs at the time. However, with 35 years gone by and a new tenant moving into at least two floors of the building, new and updated systems were in order.

Working Through the Holidays

ITT officials began by contracting Air Comfort Corporation (Broadview, IL) to replace one of the building’s air-handling units and install a new exhaust/return air fan and rooftop condensing unit. In addition, the scope of work called for two new duct runs — one supply and one return — to be installed in a vertical riser shaft from the 20th-floor mechanical room to the 12th- and 13th-floor tenant areas.

“The project was a particular challenge because of the complexity and timing of the work,” says Patrick Golden, Air Comfort’s project manager. “We received the order just after Thanksgiving,” he recalls, adding that the contract included “a substantial completion clause” with a target date of January 15.

Because of the short turnaround time, some of the major equipment was pre-ordered, according to Bill Casica, IIT’s plant manager for facilities operations. It was up to Air Comfort, however, to place orders for the remaining equipment and then coordinate all deliveries and installment in order to meet the deadline. “Normally, a project of this scope would be scheduled to proceed in a smooth and orderly fashion,” says Golden. But “because of the compressed time schedule, several aspects of the work were occurring at the same time.”



Down to the Wire

While this work was taking place, subcontractors working under Air Comfort’s direction were demolishing an old air handler and associated ductwork to make room for the new equipment; they also removed portions of brick and block walls to allow for moving the new air handler into the building and in position on a newly poured concrete pad. Piping crews were kept busy relocating existing pumps and temporarily removing a large section of piping to allow the new equipment to be moved through the congested equipment room.

The Sunday before Christmas, three weeks after receiving the order, Air Comfort took delivery of the major pieces of equipment at the jobsite. A helicopter was used to hoist the equipment and set it in position. The air handler was hoisted in sections, each section being lowered onto a temporary wooden platform, and moved from there into the building.

“The helicopter hoisting operation was started shortly after dawn and completed by noon,” says Golden. In the weeks following, the air handler was assembled in place on its concrete pad, and piping and sheet metal crews completed their work. Electricians, control technicians, and insulators also worked as the target completion date loomed.

Two of the last components to arrive were the pair of frequency drives which control the speed of the new air handler’s blower and exhaust/return air fan. The drives were shipped by air freight one week prior to completion, installed and wired by the electrical subcontractor, then test-run for the first time on January 14.

Thanks to a fine sense of timing and execution, plus quality equipment and on-site work, there were no snags in the final installation. “A well-planned and coordinated effort by everyone involved helped us meet the targeted completion date,” adds Golden.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

 

Recommended Content

JOIN TODAY
To unlock your recommendations.

Already have an account? Sign In

  • HVAC-enrollment

    The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

    A new wave of future technicians is entering the pipeline.  
    Training and Education
    By: Matt Jachman
  • 2025 Top 40 Under 40

    2025 Top 40 Under 40 HVACR Professionals List

    The 11th annual Top 40 Under 40 list highlights those...
    HVAC Contracting
    By: Hannah Belloli-Oster
  • LG Ductless Mini-Split Systems

    The 9 Types of Heat Pumps

    As the U.S. moves toward electrification, heat pumps are...
    Ground Source Heat Pumps
    By: Joanna R. Turpin

More Videos

Today's Boiler

Spring 2026 Issue

Today's Boiler - Spring 2026 Cover

Read More from Today's Boiler

Case in Point Logo

Smarter Hydronic Design for Data Centers - Free Webinar - January 22, 2026

Related Articles

  • An education in ductwork fabrication: Training center prepares students for making and installing ductwork

    See More
  • Contractors Get An Education At Problem Solving 101

    See More
  • New Buildings Institute Introduces Retrofit Savings Estimator

    See More

Related Products

See More Products
  • new cover.jpg

    Profit is An Attitude: The Strategies You Need to Optimize Profits

  • EHEP002028.jpg

    Principles of Heating, Ventilation, and Air Conditioning in Buildings, 1st Edition

  • 0880690186-228x228.jpg

    Airflow in Ducts

See More Products

Related Directories

  • National Comfort Institute-NCI

    National Comfort Institute (NCI) is a High-Performance HVAC professional training, certification, and membership organization. NCI offers a full range of advanced technical and sales training options.
  • National HVACR Education Conference

    This conference provides a unique opportunity to gain firsthand access to the latest advancements in HVACR tools, equipment, and training solutions—all designed to enhance education and workforce development. Leading manufacturers and suppliers will showcase cutting-edge technologies, offering live demonstrations and expert insights to help you integrate the best solutions into your classrooms, labs, and businesses.
×

Sign Up. Stay Informed.

The #1 trusted source for the HVACR industry since 1926

SUBSCRIBE
  • RESOURCES
    • Advertise
    • Contact Us
    • Advisory Board
    • Classifieds
    • Submit a Letter
    • Directories
    • Store
  • ACCOUNT CENTER
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • Instagram
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing