Case Study: Greenville HVAC Company Speeds Up Cable Suspension
South Carolina HVAC company moves from strut and all-thread to Griplock
A leading HVAC company in Greenville, SC, recently incorporated Griplock Systems’ innovative HVAC cable suspension systems into their installation process. This case study examines how the HVAC company previously installed HVAC ductwork before adopting Griplock’s cable suspension systems, the estimated time savings achieved by using the product, and feedback from the company’s Project Manager regarding the experience of working with Griplock Systems.
The Greenville HVAC company had traditionally relied on strut and all-thread for the installation of HVAC ductwork. While this method had been effective, it often proved time-consuming and required additional labor. Seeking a more efficient solution, the company decided to explore alternative options and eventually discovered Griplock Systems’ HVAC cable suspension systems.