Motor Won't Come Up To Speed

August 31, 2004
/ Print / Reprints /
ShareMore
/ Text Size+

What do you check if an HVACR motor is failing to come up to speed or accelerate? Ask yourself the following:

  • Was the motor applied properly? In other words, does it have enough starting or acceleration torque? If it is a shaded-pole motor, you may need to use a permanent split capacitor (PSC) type. (This is particularly true for multi-speed applications that run on lower speeds.) If it is a split-phase motor, replace it with a capacitor-start unit.

  • Is the voltage too low at the motor terminals? Measure carefully! The motor should operate within 10 percent of its nameplate voltage. If you find voltage lower than 90 percent of what is marked on the nameplate, use a higher-hp motor or a motor with a service factor.

  • Is the motor overloaded? Check its amp draw. If the amp draw is greater than 110 percent of what is marked on the nameplate, you may need to replace the motor with a higher-hp motor or a motor with a service factor. If it is a belt-load system, consider using a smaller motor pulley or larger load pulley. If there is an adjustable pulley on the motor, adjust it for a smaller diameter.

  • Check the motor's connections; are they loose, damaged, or faulty? High-resistance connections at the terminal board can lower the voltage that the motor sees and can also cause severe overheating. Make sure that all quick connects are snug.

  • Is the belt tight (in cases where the load is connected with a belt to the motor)? Loosen the belt and retighten it to the manufacturer's specs.

  • Are there signs of rotor rub? Does the motor "bark" or "growl" when it is first energized? The bearings might be worn. Check for side-to-side play. If there is side-to-side play, the bearings are worn. Replace the motor.

  • Are the bearings dry? If so, the shaft will be difficult to turn; that means permanent damage usually has already taken place. Again, you need to replace the motor.

    For more information, click on the Emerson Climate Technologies logo above.

  • Did you enjoy this article? Click here to subscribe to The NEWS Magazine

    You must login or register in order to post a comment.

    Multimedia

    Videos

    Image Galleries

    2014 MCAA Annual Convention

    Scenes from the 2014 MCAA Annual Convention in Scottsdale, Ariz.

    Podcasts

    NEWSmakers: Julian Scadden

    Training is an ongoing process. Julian will discuss how you can generate maximum return on time and energy invested training by following a three part process. Listen to this podcast to get expert tips on training, tracking and follow up. 

    More Podcasts

    ACHRNEWS

    NEWS 04-21-14 cover

    2014 April 21

    Check out the weekly edition of The NEWS today!

    Table Of Contents Subscribe

    SERVICE CALLS POLL

    Which statement on service calls best applies to your business?
    View Results Poll Archive

    HVACR INDUSTRY STORE

    plumbing-hvac.gif
    2014 National Plumbing & HVAC Estimator

    Every plumbing and HVAC estimator can use the cost estimates in this practical manual!

    More Products

    Clear Seas Research

     

    Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

    DON'T MISS A THING

    Magazine image
     
    Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

    STAY CONNECTED

    facebook icontwitter iconyoutube iconLinkedIn i con