The Luigi Pecci Centre for Contemporary Art once again reopened
Mitsubishi Electric Hydronics & IT Cooling Systems, through its brand Climaveneta, supplied the air conditioning system for the rebirth of the Luigi Pecci Centre in Florence. After six years of construction and being closed for three years, the Luigi Pecci Centre for Contemporary Art once again reopened in the fall of 2016. It is the first institution in Italy to be built from scratch with the specific intent to exhibit, collect, preserve, document, and distribute the most advanced artistic research.
To ensure sufficient appreciation of this heritage, at the beginning of the 21st century, the Pecci Centre decided to double its exhibition space and, at the same time, restructure the original building of Italo Gamberini.