They chose an Energy Star®-certified builder and committed, early on, to installing a high-efficiency geothermal HVAC system.
Most geothermal loop installations are routinely completed in a day or two, but occasionally geothermal installations like the Heindrichs' offer unique challenges to the contractor and the loop installer.