“The building itself has been designed very tight — tight architectural design and features. That means a minimum of spacing for ductwork and equipment.”
Markarian says that “In certain areas, we’ve had only a one-inch clearance. That’s been particularly true with a lot of the equipment rooms. We’ve had to custom build isolation exhaust and supply fans because of the height limitations.”