Pfizer Finds $35,000 Energy Savings Through Pilot Duct Sealing Project
Measured results confirm savings potential of duct sealing
Building: Pfizer dry compress building Location: Vega Baja facility, Puerto Rico Owner: Pfizer Pharmaceutical Aeroseal Contractor: Nemar Technology Group Goal: Improve performance / Reduce energy use Before Aeroseal: 2,424 CFM of leakage After Aeroseal: 77 CFM of leakage Results: Increased performance. NTG was able to effectively balance the system. Pfizer saving $35,000 annually.