According to Laura Wand, vice president, chiller solutions, Johnson Controls Inc., “The latest versions of the standard [ASHRAE 90.1] elevate the importance of off-design conditions.” Wand said Johnson Controls agrees with this direction for evaluating efficiency since “design point typically only represents 1 percent of the annual operation.”