ACHR News
search
Ask ACHR NEWS AI
cart
facebook twitter instagram linkedin youtube
  • Sign In
  • Subscribe
  • Sign Out
  • My Account
ACHR News
  • NEWS
    • Breaking News
    • New HVAC Products
    • Featured Products
    • Manufacturer Reports
    • HVAC Data
    • Legislation
    • ACHR NEWS Centennial
  • RESIDENTIAL
    • Air Conditioners
    • Furnaces
    • Residential Heat Pumps
    • Ductless
    • Residential IAQ
    • Testing, Monitoring, Tools
    • Components & Accessories
  • COMMERCIAL
    • Air Handlers
    • Rooftop Units
    • Chillers and Cooling Towers
    • Commercial Heat Pumps
    • Boilers and Hydronics
    • VRF/Ductless
    • Commercial IAQ
  • REFRIGERATION
    • Refrigerants
    • Refrigerant Regulations
    • Leak Management
  • CONTRACTOR PRO
    • Geothermal
    • Homeowner Study
    • VRF and VRV Ductless
    • Unitary Trends
  • EDUCATION
    • Training and Education
    • Business Management
    • Service and Maintenance
    • Continuing Education
    • Market Research >
      • HVAC Brand Awareness Report
      • VRV, VRF, VRVZ Report
      • Unitary Trends Report
      • Water Heat Professionals Report
    • Webinars
    • Sponsor Insights
    • eProducts Info
    • White Papers
  • EVENTS
    • HVAC Contractor Forum
    • Industry Events and Webinars
  • MEDIA
    • Videos
    • AHR Expo 2025 Videos
    • Podcasts >
      • ACHR News Podcast
      • HARDI Podcasts
      • AHR Expo Podcasts
      • ACCA Podcasts
    • Interactive Spotlights
    • Quizzes
    • eBooks
    • HVAC Talkback
  • HVAC GROUP
    • ACHR NEWS >
      • Current Issue
      • Digital Edition
      • Subscribe
    • Distribution Trends
    • SNIPS NEWS >
      • Join SNIPS NEWS
    • Engineered Systems News >
      • Join ES News
    • HVACR Directory
    • Contests
    • Newsletters
    • Contact
    • Advertise
    • My Account
Regional ReportsWest

Lessons Learned From LA’s Airport Center Project

December 3, 2001
Old chillers are energy gobblers, but in days gone by, the price of electricity was low enough that building owners put off replacement. Today, with California’s soaring utility costs, looking for ways to save energy has become one of the hottest games in town. Then along comes Los Angeles’ Department of Water & Power (DWP) to give owners a push — cash incentives for replacing older chillers with new, energy-efficient models, provided they have them up and running by December 31 of this year.

By working with owners who are ready to make the chiller-replacement plunge, Los Angeles area contractors can cash in on energy rebate programs too.

STATE INCREASES EFFICIENCY STANDARDS

“Title 24’s state-mandated standards currently call for efficiencies of .75 kW/T or better,” says John Lockett, utility marketing representative for the DWP’s Chiller Efficiency Program. “In October, Title 24 standards will become much more stringent, dictating a minimum efficiency of .576 kW/T for any new installation. That’s a dramatic change, since many new chillers being sold are far less efficient than this.”

“There are a bunch of large buildings in downtown LA with chillers that are 20 to 30 years old,” says Trane sales engineer Brett Gaviglio. “According to my own survey, 75% of the machines are an average of 15 years old or older.”

“Currently, the average chiller out there is running between .80 and .90,” says Lockett. “When the new Title 24 standards are implemented, this will really influence the market. We’re not sure how these new standards will impact the chiller rebate program. What we’re telling owners is that they need to proceed with due haste under the current standards.”

As of the end of April, the DWP had 28 large commercial buildings under contract for the rebate program — totaling some $2 million in incentives.

“Title 24 has three chiller ranges,” says Lockett. “Less than 150 tons, 150-300 tons and more than 300 tons. My focus has been on the larger chillers, because that’s where we find the biggest bang for the buck, but I don’t want to discourage anyone.”



AIRPORT CENTER A CASE IN POINT

The four chillers at Airport Center, a three-building complex a few blocks from the Los Angeles International Airport, were built in 1961, 1964 and 1969. In short, they were well past their prime.

“We probably would have replaced the chillers in another three or four years,” says Andy Mircovich, Airport Center’s general manager, “but with the rebates and the expected energy savings of $250,000 a year, the equipment and installation will be paid for in about two and a half years. After that, we’ll be saving a quarter of a million a year.

“With those kind of figures, I sat down with the owners, Jupiter Realty, and within five minutes they approved the chiller replacements.”

Looking for quick answers on air conditioning, heating and refrigeration topics? Try Ask ACHR NEWS, our new smart AI search tool. Ask ACHR NEWS →

“Usually with chiller replacements, you’re looking at a payback time of five to six years or more,” says Gaviglio. “Here it is less than three years. That makes a big difference.”

Mircovich says the 860- and 725-ton chillers and one of the 400-ton chillers (the other was redundant) were “ordered, manufactured and fully installed in three to four months” and became fully operational by June 30.

DOING THE NUMBERS

“In one particular building (at Airport Center), at full load, the chiller was using 625 kw—a lot of power,” says Gaviglio. “We proposed an alternative of 392 kw. The DWP gave them $100,000 to make this efficiency improvement.”

The price of the three chillers totaled $600,000, plus installation. Combined with additional rebates totaling another $150,000, the utilities paid approximately 40 percent of the purchase price.

“What we’ve found is that, generally, owners don’t buy the high-efficiency machines because they’re too expensive,” says Gaviglio. “But with the rebate program, they’re actually paying less for a more-efficient machine than they would have paid if they’d kept their old, less-efficient machine.

“Looking at the efficiencies alone, you have an advantage when you replace a 300-ton chiller. By the time you’re looking at a 1,000-ton machine, it’s an unstoppable advantage. And with a 1,500-ton machine, it’s a no-brainer.”

The rebate program has definitely made some projects happen that would not have gotten over the cost-deterrent hump in previous years. Though many building owners have done studies to determine that they need to replace their old chillers and though they have wanted to go with more-efficient machines, it took the DWP’s rebate programs — as well as those offered by the gas company — to push them into action.

Gaviglio is confident that more and more owners will see the sense in replacing chillers. Some may not be ready this year because of the inconvenience of the change-out. “It takes two to four months to get a chiller and the building is without chiller capacity for one to two weeks during installation,” he says. “Unless you’ve got a lot of redundancy, it requires creativity and timing to retrofit.”

Other owners may be taking a wait-and-see attitude: if the DWP has this rebate program, it will have others. It’s not in the budget for this year, but may be added to next year’s or the year after’s wish list.

“Rebates will influence the majority of owners,” says Gaviglio. “The ones who aren’t yet ready for it this year will be ready in the next couple of years.”

“The energy-savings issue isn’t new,” says sales manager Pat Mcguire of Azusa, CA-based Centrifugal Technologies, Inc.“In the last 12 years, the operational efficiency of centrifugal chillers has been improving. Owners have known that ‘gee whiz! If I change out a .85 or .9 rush kw/T chiller to .55 in kw/T yield, I’ll have 35-45 percent energy savings.’ The arithmetic is very simple. But not many people are making the capital budget allocations to do it. This rebate program gives them a little boost.”

“The life cycle return on the investment is so high and the risk is so low, that it would be foolish not to change.”

Sidebar: LA DWP Energy-Efficiency Programs

Chiller Efficiency Program: Chillers installed by December 31, 2001, are eligible for up to $850 per kW reduced beyond Title 24 standards, depending upon when the installation occurs. In addition to this incentive, use of a new, high-efficiency chiller can result in electricity savings of hundreds of thousands of dollars over the chiller’s operating lifetime.

Thermal Energy Storage (TES) Program: The TES program offers incentives of up to $600 per kW of peak demand shifted for commercial and industrial customers who install TES systems that shift building cooling load from peak to off-peak. Tanks store ice or chilled water produced at night to be used for cooling during the day. In some cases, the DWP also pays the cost of feasibility studies—up to $10,000. In the long term, TES reduces building peak demand and thereby utility costs, and can also lower cooling equipment capacity requirements and intial capital costs with the downsizing of the chiller.

Hvac Incentives Program: Both commercial and residential customers are eligible for cash incentives to tune-up or replace hvac equipment. For the a/c tune-up option, the DWP picks up all but a modest co-payment: no more than $60 for commercial units and no more than $40 for residential units. Tune-ups include, but are not limited to:

  • Cleaning evaporator and condenser coils;
  • Inspecting suction line insulation, system airflow and ductwork, and supply fans, motors and belts; and
  • Measuring and recording electrical performance of package units before and after tune-up.
  • For the new-equipment option, the DWP pays contractors incentives for installing heat pump or a/c units rated at Energy Star efficiency levels, as follows:

  • All units < 24,000 Btu/h, $75/unit;
  • Heat pumps of 24,000-120,000 Btu/h, $150/ton; and
  • Other package or split a/c of 24,000-120,000 Btu/h, $115/ton.
  • Contractors, in turn, offer owners lower equipment purchase and installation costs.

    Commercial Lighting Efficiency Offer (CLEO): For small and medium-sized business customers, the DWP offers cash incentives for the installation of qualifying lighting and reduced electricity costs for improved workplace lighting, as well as reduced maintenance costs.

    For all comercial/industrial customers, the DWP offers cash incentives of up to $600 for every peak-period KW reduced with lighting retrofits, as well as those reduced below existing Title 24 standards for new construction.

    Publication date: 12/03/2001

    Share This Story

    Looking for a reprint of this article?
    From high-res PDFs to custom plaques, order your copy today!

     

    Recommended Content

    JOIN TODAY
    To unlock your recommendations.

    Already have an account? Sign In

    • HVAC-enrollment

      The Trades Are Back: HVACR Programs See Nearly 30% Enrollment Spike

      A new wave of future technicians is entering the pipeline.  
      News
      By: Matt Jachman
    • 2025 Top 40 Under 40

      2025 Top 40 Under 40 HVACR Professionals List

      The 11th annual Top 40 Under 40 list highlights those...
      News
      By: Hannah Belloli-Oster
    • LG Ductless Mini-Split Systems

      The 9 Types of Heat Pumps

      As the U.S. moves toward electrification, heat pumps are...
      Heat Pumps
      By: Joanna R. Turpin
    Subscription Center
    • Create an Account
    • Start a Subscription
    • Manage My Account
    • Sign Up for Newsletters
    • Visit Customer Service
    • Update Preferences

    More Videos

    Sponsored Content

    Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to The News audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of The News or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

    close
    • Piggy Bank
      Sponsored byWatercress Financial

      Energy Prices, Inflation, and HVAC: What Today’s Homeowners Care About

    • Refrigerated Food
      Sponsored bySolstice Advanced Materials

      R-455A Refrigeration: A Cold Storage Solution for the Future

    • Airex Rooftop Units
      Sponsored byAirex Manufacturing Inc

      Consolidating Roof Penetrations: A Growing Trend in Multifamily HVAC Design

    Popular Stories

    HVAC-Price-Increase-graphic

    HVAC Price Increase List: June 2026

    Trump-Section-232.jpg

    Trump Reduces Section 232 Tariffs on HVAC Equipment to 15%

    R410A-Refrigerant-Cylinder.jpg

    Refrigerant Recovery is a Revenue Opportunity

    Heat-pump-cutaway.jpg

    PFAS Rules and A2L Building Codes Continue to Evolve

    Kroger.jpg

    Kroger to Spend $100 Million to Reduce Refrigerant Leaks

    View The ACHR NEWS
    Centennial Anniversary Timeline

    The ACHR News Timeline Chart
    Submit a Letter
    Submit a letter to our editors.

    Events

    November 6, 2025

    Next-Gen Data Center Cooling: HVAC Innovation and Real-World Solutions

    On Demand As AI workloads and high-density computing push traditional cooling methods to their limits, the data center industry is accelerating the adoption of next-generation HVAC technologies.

    June 9, 2026

    Before You Go All In on AI: Set Up Your Business to Actually Win

    In this webinar, we'll walk you through exactly what to get in place before you add AI to your business. You'll leave with a clear picture of where you stand today and a practical action plan to set yourself up for real results.

    View All Submit An Event

    Poll

    Summer Staff

    Are you fully staffed for the summer season?
    View Results Poll Archive

    Products

    BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

    BNI Mechanical/Electrical Square Foot Costbook, 2026 Edition

    See More Products
    A2L Refrigerants - Free Webinar - May 21, 2026

    Related Articles

    • Lessons Learned From L.A.’s Airport Center Project

      See More
    • Tomorrow's Environment

      Lessons Learned from the Pandemic

      See More
    • HARDI conferences

      If I Told You … Lessons Learned from HARDI Conferences

      See More

    Related Products

    See More Products
    • Lessons Learned Servicing Boilers

    • lessons learned selling.jpg

      Lessons Learned Selling HVAC Service

    • Lessons Learned in a Boiler Room: A common sense approach to servicing and installing commercial boilers

    See More Products

    Events

    View AllSubmit An Event
    • June 24, 2025

      Regional Considerations in Data Center MEP Design: From Desert to Coast

      On Demand Join ES NEWS' Editor Austin Keating and the panel for an expert examination of regional data center design strategies. They will be joined by data center commissioning experts and manufacturer representatives.
    View AllSubmit An Event

    Related Directories

    • Cal Am Manufacturing

      Cal Am manufactures products used to distribute/transmit electricity or broadband communications for the utility and fiber optic markets such as, data centers, 4G & 5G installations, municipal projects, hospitals, airports, industrial parks, military installations, college campuses, power generation etc.
    ×

    Sign Up. Stay Informed.

    The #1 trusted source for the HVACR industry since 1926

    SUBSCRIBE
    • RESOURCES
      • Advertise
      • Contact Us
      • Advisory Board
      • Classifieds
      • Submit a Letter
      • Directories
      • Store
    • ACCOUNT CENTER
      • Create an Account
      • Start a Subscription
      • Manage My Account
      • Sign Up for Newsletters
      • Visit Customer Service
      • Update Preferences
    • SERVICES
      • Marketing Services
      • Reprints
      • Market Research
      • List Rental
      • Survey/Respondent Access
    • STAY CONNECTED
      • LinkedIn
      • Facebook
      • Instagram
      • YouTube
      • X (Twitter)
    • PRIVACY
      • PRIVACY POLICY
      • TERMS & CONDITIONS
      • DO NOT SELL MY PERSONAL INFORMATION
      • PRIVACY REQUEST
      • ACCESSIBILITY

    Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

    Design, CMS, Hosting & Web Development :: ePublishing