Refrigeration / Humidification & Dehumidification

Humidity, Pressure, and Airflow Tune-up for Turkey Plant

turkeysEven turkeys need comfort in preparation for … well, you know.

And once the birds reach their long-intended purpose, there is even more of a need for refrigeration and freezing. And the folks who prep the birds for that purpose need comfortable working conditions.

To make sure conditions are the best for all concerned, an 80,000-square-foot turkey products plant in Jonesboro, Ark., underwent an overhaul.

There were problems before the overhaul: High humidity levels causing continuous condensation issues, negative pressures in the processing areas, process area temperatures that were near the limit of allowable specifications, and improper airflow patterns.

The first phase of the project involved a study of the plant processes and existing conditions. This included identifying all air systems, airflow patterns, current plant operation models, wash-down, and refrigeration systems. The resulting plan included adding desiccant DHMUA systems from Bry-Air, chillers, ductwork, and utilities as well as modifying existing MUA systems, exhaust systems, and air movement devices.

The plan implemented used desiccant DH systems and rental chillers. Local contractors installed the electrical, piping, ductwork, roofing, and rigging. Bry-Air provided design, support, supervision, start up, and commissioning.

How It Turned Out

Among the end results, listed by Bry-Air:

• Humidity levels are being maintained below condensation dew points at all ambient conditions.

• Process space temperatures have been lowered 5 to 10°F because of frost reduction on the refrigeration coils.

• Defrost cycles have been reduced by 50 to 70 percent, and in some cases could be completely eliminated.

• The process space is maintained with sufficient positive pressure to minimize or eliminate moisture and thermal infiltration.

• Internal process space airflow patterns are correct for proper cleanliness and quality requirements.

• Wash-down dry-out is quicker and less labor intensive.

• Process exhaust has been reduced by 60 percent with no negative effect on process quality.

• Floors dry quickly and stay dry during daily process cycle.

• Building structure has been dried out. The concrete is dry as is the roof structure.

For more information, go to www.bry-air.com.

Publication date: 10/22/2012

Did you enjoy this article? Click here to subscribe to The NEWS Magazine

Peter Powell is Refrigeration Editor. E-mail him at peterpowell@achrnews.com.

Recent Articles by Peter Powell

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

2013 ACCA Conference & IE3 Expo

Photos from the 2013 ACCA Conference & IE3 Expo in Orlando, Fla.

Podcasts

Cade Clark, assistant vice president of government affairs for the Air-Conditioning, Heating & Refrigeration Institute (AHRI), gives a brief overview of the new version of the Shaheen-Portman bill, what AHRI thinks of the energy-efficiency legislation, and how it might affect the HVACR industry if it becomes law.
More Podcasts

THE MAGAZINE

ACHRNEWS

NEWS 05-20-13 cover

2013 May 20

Check out the weekly edition of The NEWS today!

Table Of Contents Subscribe

HVAC LEASING

Some HVAC contractors have introduced leasing programs for consumers. Do you think this is a viable option?
View Results Poll Archive

Clear Seas Research

Clear Seas ResearchWith access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

DON'T MISS A THING

Magazine image
 
Register today for complete access to ACHRNews.com. Get full access to the latest features, Extra Edition, and more.

STAY CONNECTED

facebook icontwitter iconyoutube iconLinkedIn i con