Tweet/Garot and August Winter provided all of the plumbing, heating, ventilation, air conditioning, and temperature control work for the Lambeau Field project. The project consisted of more than 45 miles of piping, 2,600 new plumbing fixtures, 1 million pounds of ductwork, and approximately 2,000 tons of air conditioning, installed over a two-year period.
Publication date: 01/31/2005
Report Abusive Comment